Transport CanadaElectrical

THE POWER JUNCTION STUD BLOCK WAS MOUNTED TO THE ENGINE TUNNEL WITH A LARGER THAN SPECIFIED SCREW

Filed April 18, 199434 vehicles

What's wrong

THIS DID NOT ALLOW FOR ADEQUATE CLEARANCE BETWEEN THE SCREW HEAD AND THE RING TERMINALS WHICH ATTACH TO THE STUD. IF CONTACT SHOULD OCCUR, AN ELECTRICAL SHORT WILL RESULT AND POSSIBLY CAUSE A FIRE. CORRECTION: CORRECT FASTENERS WHICH ARE RECESSED INTO THE MOUNTING BLOCK WILL BE INSTALLED.

Confirm with a Freightliner dealer · Only the manufacturer confirms which recalls apply to one VIN.